c2c Overcrowding Relief - M

c2c - M
 
c2c Overcrowding Relief
 
As part of the new 2014 franchise, c2c committed to leasing new trains to cope with rising passenger numbers, which were boosted especially by the opening of the Docklands Light Railway station at West Ham in 2011 and the rise of Canary Wharf as a financial centre.
 
The Class 357 trains had been introduced with high density 3+2 seating, consisting of 282 seats and space for 124 standing, giving a total capacity of 406 passengers per four carriage unit. In late 2015 c2c adapted 20% of its carriages into a "Metro" configuration with seats removed around doorways and in the aisle to provide a 2+2 layout. The Metro configuration consists of 222 seats, space for 334 standing, and a total passenger capacity of 556 per four carriage unit.
 
This addressed the issue of the high volumes of passengers using c2c to travel to/from West Ham and Barking, which, with Upminster, are served by the parallel London Underground service. In the evening peak, these passengers can displace those eastbound passengers who use more easterly and less well-served stations.
 
In early 2016, c2c announced that it would lease additional trains to relieve overcrowding. This led to its leasing six Class 387s for three years from Porterbrook to increase capacity on the busiest services. The first entered service in November 2016.
 
c2c Overview
 
c2c Franchise(s):
London, Tilbury & Southend: 26 May 1996 – 8 November 2014
Essex Thameside: 9 November 2014 – 18 July 2021
c2c Contract(s): Essex Thameside: 19 July 2021 – 20 July 2025
Main Route(s): Fenchurch Street to Shoeburyness
c2c Other Route(s):
Fenchurch Street to Grays via Rainham
Fenchurch Street to Pitsea via Ockendon
Liverpool Street to Shoeburyness
c2c Fleet Size:
74 Class 357 Electrostar sets
c2c Stations Called At: 28
c2c Stations Operated: 25
c2c Parent Company:
Prism Rail (1996–2000)
National Express (2000–2017)
Trenitalia (2017–present)
c2c Headquarters: Cutlers Court, 115 Houndsditch, London
c2c Reporting Mark: CC
c2c Dates of Operation: 26 May 1996–
c2c Predecessor: Network SouthEast
c2c Technical Length: 125.5 kilometres (78.0 mi)
 
c2c Route Map Legend
 
London
 
Fenchurch Street        Liverpool Street
Limehouse                  Stratford
West Ham
East Ham Depot
                                     Barking
Dagenham Dock       Upminster
Rainham                     Ockendon
Purfleet                       Chafford Hundred
                                     Lakeside
Grays                          West Horndon
Tilbury Town
East Tilbury               Laindon
Stanford-le-Hope     Basildon
                                   Pitsea
                                   Benfleet
                                   Leigh-on-Sea
                                   Chalkwell
                                   Westcliff
                                  Southend Central
                                  Southend East
                                  Thorpe Bay
                                  Shoeburyness
 
 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: