Austria High-Speed RailAustria High-Speed RailThe West railway between the capital Vienna and Salzburg is being upgraded. Most new sections have a continuous maximum design speed of 250 km/h (155 mph). German and Austrian ICE trains operate at a maximum speed of 230 km/h (143 mph), as do Austrian locomotive-hauled trains (called railjet) which were launched in 2008. The section between Attnang-Puchheim and Salzburg has not been part of the massive investments during the past decades. Therefore a new high-speed rail line between Köstendorf and Salzburg is being planned by ÖBB. Long distance and freight trains are planned to run through a 21.3 km (13.2 mi) long new track that is designed for a maximum speed of 250 km/h (155 mph). This new infrastructure should enable to substantially increase the number of regional trains on the existing tracks and cut travel times for long distance connections by using the new tunnels. Construction works are expected to begin in 2025/2026. The 56 km (35 mi) Brenner Base Tunnel under construction will allow speeds of up to 250 km/h (155 mph). The expected year of completion is 2032. The first part of the New Lower Inn Valley Railway was opened in December 2012 as part of an upgrade of the line connecting the future Brenner Base Tunnel and southern Germany, which is being upgraded from two tracks to four and to a maximum design speed of 250 km/h (155 mph). The section is also part of the Berlin-Palermo railway axis. The Koralmbahn, the first entirely new railway line in the Second Austrian Republic has been under construction since 2006. It includes a new 33 km (21 mi) tunnel (the Koralmtunnel) connecting the cities of Klagenfurt and Graz. Primarily built for intermodal freight transport, it will also be used by passenger trains travelling at up to 250 km/h (155 mph). The travel time between Klagenfurt and Graz will be reduced from three hours to one hour. The Koralmbahn is expected to be operational by 2025. Another important project on the Southern Railway is the Semmering Base Tunnel. The new tunnel connects the states of Lower Austria and Styria and allows massive travel time reductions compared to the existing Semmering railway. The new base tunnel will become operational in 2028. Austria High-Speed Rail Network
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|