Light Rail Construction and Operation CostsLight Rail Construction and Operation Costs The cost of light rail construction varies widely, largely depending on the amount of tunneling and elevated structures required. A survey of North American light rail projects shows that costs of most LRT systems range from $15 million to over $100 million per mile. Seattle's new light rail system is by far the most expensive in the US, at $179 million per mile, since it includes extensive tunneling in poor soil conditions, elevated sections, and stations as deep as 180 feet (55 m) below ground level. This results in costs more typical of subways or rapid transit systems than light rail. At the other end of the scale, four systems (Baltimore, Maryland, Camden, New Jersey, Sacramento, California, and Salt Lake City, Utah) incurred construction costs of less than $20 million per mile. Over the US as a whole, excluding Seattle, new light rail construction costs average about $35 million per mile. By comparison, a freeway lane expansion typically costs $1.0 million to $8.5 million per lane mile for two directions, with an average of $2.3 million. However, freeways are frequently built in suburbs or rural areas, whereas light rail tends to be concentrated in urban areas, where right of way and property acquisition is expensive. Combining highway expansion with LRT construction can save costs by doing both highway improvements and rail construction at the same time. As an example, Denver's Transportation Expansion Project rebuilt interstate highways 25 and 225 and added a light rail expansion for a total cost of $1.67 billion over five years. The cost of 17 miles (27 km) of highway improvements and 19 miles (31 km) of double-track light rail worked out to $19.3 million per highway lane-mile and $27.6 million per LRT track-mile. The project came in under budget and 22 months ahead of schedule. LRT cost efficiency improves dramatically as ridership increases, as can be seen from the numbers above: the same rail line, with similar capital and operating costs, is far more efficient if it is carrying 20,000 people per hour than if it is carrying 2,400. However, Calgary's LRT ridership is much higher than any comparable US light rail system, at 300,000 passengers per weekday, and as a result, its capital efficiency is also much higher. Its capital costs were one-third those of the San Diego Trolley, a comparably sized US system built at the same time, while by 2009 its ridership was approximately three times as high. Thus, Calgary's capital cost per passenger was much lower than that of San Diego. Its operating cost per passenger was also much lower because of its higher ridership. A typical C-Train vehicle costs only CA$163 (equivalent to $212 in 2021) per hour to operate, and since it averages 600 passengers per operating hour, Calgary Transit estimates that its LRT operating costs are only 27 cents per ride, versus $1.50 per ride on its buses. Compared to buses, costs can be lower due to lower labor costs per passenger mile, higher ridership (observations show that light rail attracts more ridership than a comparable bus service) and faster average speed (reducing the number of vehicles needed for the same service frequency). While light rail vehicles are more expensive to buy, they have a longer useful life than buses, sometimes making for lower life-cycle costs. Light Rail Health Impact Light Rail Integration with Bicycles Light rail lines have various policies on bicycles. Some fleets restrict bicycles on trains during peak hours. Some light rail systems, such as the St. Louis MetroLink, allow bicycles on the trains, but only in the rear sections of cars. Some light rail lines, like San Francisco's, allow only folding bicycles onboard. In some systems dedicated bike parking is available at select stations and others are integrated with local bike share systems.
| |||||
|