Guiyang–Kunming (Section) ~ Changsha–Kunming High–Speed Railway

Guiyang–Kunming (Section) ~ Changsha–Kunming High–Speed Railway

Shanghai–Kunming Corridor (沪昆通道) China High-Speed Horizontal Line

The Shanghai–Kunming high-speed railway is a high-speed railway line. It was built in stages and completed on 28 December 2016. It is part of the CRH's system of passenger-dedicated lines, beginning in Shanghai and ending in Kunming, the capital of Yunnan Province. Following a fairly similar route to the older "conventional" Shanghai–Kunming Railway, the Shanghai–Kunming high-speed railway passes through four more provincial capitals, the cities of Hangzhou, Nanchang, Changsha, and Guiyang.

The entire line is operational. The last section, Guiyang–Kunming, was opened on 28 December 2016. On some sections, operational speeds were reduced from 300 kilometres per hour (190 mph) to 70 kilometres per hour (43 mph), due to some problems in construction, confirmed by the state media.

China High-Speed Railway "Eight Vertical Lines and Eight Horizontal Lines"

Railway Map of China

Shanghai–Kunming Corridor (沪昆通道) China High-Speed Horizontal Line

Shanghai–Kunming ~ Shanghai–Kunming High–Speed Railway 2,258 km
~ HSR Corridor connecting East, Central and Southwest China ~ 350 km/h ~ 2,258 km
~ It consists of three sections connecting Shanghai, Hangzhou, Changsha with Kunming

Shanghai–Hangzhou (Section) ~ Shanghai–Hangzhou High–Speed Railway 150 km
~ HSR connecting Shanghai with Hangzhou ~ 350 km/h ~ 150 km

Hangzhou–Changsha (Section) ~ Hangzhou–Changsha High–Speed Railway 933 km
~ HSR connecting Hangzhou with Changsha, via Nanchang ~ 350 km/h ~ 933 km

Hangzhou–Nanchang (Section) ~ Hangzhou–Changsha High–Speed Railway

~ HSR connecting Hangzhou with Nanchang

Nanchang–Changsha (Section) ~ Hangzhou–Changsha High–Speed Railway
~ HSR connecting Nanchang with Changsha

Changsha–Kunming (Section) ~ Hangzhou–Changsha High–Speed Railway
~ HSR connecting Changsha with Kunming

Changsha–Kunming ~ Changsha–Kunming High–Speed Railway 1,175 km
~ HSR connecting Changsha with Kunming ~ 350 km/h ~ 1,175 km

Changsha–Xinhuang (Section) ~ Changsha–Kunming High–Speed Railway
~ HSR connecting Changsha with Xinhuang

Xinhuang–Guiyang (Section) ~ Changsha–Kunming High–Speed Railway
~ HSR connecting Xinhuang with Guiyang

Guiyang–Kunming (Section) ~ Changsha–Kunming High–Speed Railway
~ HSR connecting Guiyang with Kunming

 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: