Egyptian National Railways (ENR)

Egyptian National Railways (ENR)(السكك الحديدية المصرية)

Egyptian National Railways (ENR) or in Arabic: السكك الحديدية المصرية, is the national railway of Egypt and managed by the parastatal Egyptian Railway Authority ERA: or in Arabic: الهيئة القومية لسكك حديد مصر: romanized: Al-Haī'ah al-Qawmiyya li-Sikak Ḥadīd Miṣr: is translated as National Agency for Egypt's Railways.

Egyptian National Railways History

Egyptian National Railways 1833–1877

In 1833, Muhammad Ali Pasha considered building a railway between Suez and Cairo to improve transit between Europe and India. Muhammad Ali had proceeded to buy the rail when the project was abandoned due to pressure by the French who had an interest in building a canal instead.

Muhammad Ali died in 1848, and in 1851 his successor Abbas I contracted Robert Stephenson to build Egypt's first standard gauge railway. The first section, between Alexandria on the Mediterranean coast and Kafr el-Zayyat on the Rosetta branch of the Nile was opened in 1854. This was the first railway in the Ottoman Empire as well as Africa and the Middle East. In the same year Abbas died and was succeeded by Sa'id Pasha, in whose reign the section between Kafr el-Zayyat and Cairo was completed in 1856 followed by an extension from Cairo to Suez in 1858. This completed the first modern transport link between the Mediterranean and the Indian Ocean, as Ferdinand de Lesseps did not complete the Suez Canal until 1869

At Kafr el-Zayyat the line between Cairo and Alexandria originally crossed the Nile with an 80 feet (24 m) car float. However, on 15 May 1858 a special train conveying Sa'id's heir presumptive Ahmad Rifaat Pasha fell off the float into the river and the prince was drowned. Stephenson therefore replaced the car float with a swing bridge nearly 500 metres (1,600 ft) long. By the end of Sa'id's reign branches had been completed from Banha to Zagazig on the Damietta branch of the Nile in 1860, to Mit Bera in 1861 and from Tanta to Talkha further down the Damietta Nile in 1863.

Sa'id's successor Isma'il Pasha strove to modernise Egypt and added momentum to railway development. In 1865 a new branch reached Desouk on the Rosetta Nile and a second route between Cairo and Talkha was opened, giving a more direct link between Cairo and Zagazig. The following year a branch southwards from Tanta reached Shibin El Kom. The network started to push southwards along the west side of the Nile with the opening of the line between Imbaba near Cairo and Minya in 1867. A short branch to Faiyum was added in 1868. A line between Zagazig and Suez via Nifisha was completed in the same year. The following year the line to Talkha was extended to Damietta on the Mediterranean coast and a branch opened to Salhiya and Sama'ana.

Imbaba had no rail bridge across the Nile to Cairo until 1891. However, a long line between there and a junction west of Kafr el-Zayyat opened in 1872, linking Imbaba with the national network. From Minya the line southwards made slower progress, reaching Mallawi in 1870 and Assiut in 1874. On the west bank till Najee Hammady from which goes on east bank of the Nile till Aswan. A shorter line southwards linked Cairo with Tura in 1872 and was extended to Helwan in 1875. In the Nile Delta the same year a short branch reached Kafr el-Sheikh and in 1876 a line along the Mediterranean coast linking the termini at Alexandra and Rosetta was completed.

Egyptian National Railways 1877–1888

By 1877, Egypt had a network of key main lines and the Nile Delta had quite a network, but with this and other development investments, Isma'il had gotten the country deeply into debt. For its first 25 years of operation Egypt's national railway had never even produced an annual report. A Council of Administration with Egyptian, British and French members was appointed in 1877 to put the railway's affairs in order. They published its first annual report in 1879, and in the same year, the British Government had Isma'il Pasha deposed, exiled and replaced with his son Tewfik Pasha. In 1882, the British essentially invaded and occupied Egypt.

With these developments, the Egyptian Railway Administration's rail network stagnated until 1888, but it also put its management in much better order. In 1883 the ERA appointed Frederick Harvey Trevithick, nephew of Francis Trevithick, as Chief Mechanical Engineer. Trevithick found a heterogeneous fleet of up to 246 steam locomotives of many different designs from very different builders in England, Scotland, France and the USA. This lack of standardisation of locomotives or components complicated both locomotive maintenance and general railway operation.

From 1877 to 1888, the ERA struggled to keep up with even basic maintenance but by 1887 Trevithick managed to start a programme to renew 85 of the very mixed fleet of locomotives with new boilers, cylinders and motion. He started to replace the others with four standard locomotive types introduced from 1889 onwards: one class of 0-6-0 for freight, one class of 2-4-0 for mixed traffic, one 0-6-0T tank locomotive for shunting and one class of only ten 2-2-2 locomotives for express passenger trains. Trevithick ensured that these four classes shared as many common components as possible, which simplified maintenance and reduced costs still further.

Egyptian National Railways 1888–1914

By 1888, the ERA was in better order and could resume expanding its network. In 1890 a second line between Cairo and Tura opened. On 15 May 1892 the Imbaba Bridge was built across the Nile, linking Cairo with the line south following the west bank of the river. The civil engineer for the bridge was Gustave Eiffel. (It was reformed and renewed in 1924 which is still the only railway bridge across the Nile in Cairo.) Cairo's main Misr Station was rebuilt in 1892. The line south was extended further upriver from Assiut reaching Girga in 1892, Nag Hammadi in 1896, Qena in 1897 and Luxor and Aswan in 1898. With the railroad's completion, construction began the same year on the first Aswan Dam and the Assiut Barrage, main elements of a plan initiated in 1890 by the government to modernize and more fully develop Egypt's existing irrigated agriculture, export potential, and ability to repay debts to European creditors.

In the north in 1891, a link line was opened between Damanhur and Desouk. The line to Shibin El Kom was extended south to Menouf in the same year and reached Ashmoun in 1896. By then a line across the Nile Delta from a junction north of Talkha on the line to Damietta had reached Biyala. By 1898 this reached Kafr el-Sheikh, completing a more direct route between Damietta and Alexandria. An important extension along the west bank of the Suez Canal linking Nifisha with Ismaïlia, Al Qantarah West and Port Said was completed in 1904. Thereafter network expansion was slower but two short link lines north of Cairo were completed in 1911 followed by a link between Zagazig and Zifta in 1914.

Egyptian National Railways Overview

Egyptian National Railways Headquarters: Cairo
Egyptian National Railways Reporting Mark: ENR
Egyptian National Railways Locale: Egypt
Egyptian National Railways Dates of Operation: 1854
Egyptian National Railways Track Gauge: 1,435 mm (4 ft 8+1⁄2 in)
Egyptian National Railways Length: 5,625 kilometres (3,495 mi)

 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: