History of the Suez Canal

History of the Suez Canal

Suez Canal Interim Period

Despite the construction challenges that could have been the result of the alleged difference in sea levels, the idea of finding a shorter route to the east remained alive. In 1830, General Francis Chesney submitted a report to the British government that stated that there was no difference in elevation and that the Suez Canal was feasible, but his report received no further attention. Lieutenant Waghorn established his "Overland Route", which transported post and passengers to India via Egypt.

Linant de Bellefonds, a French explorer of Egypt, became chief engineer of Egypt's Public Works. In addition to his normal duties, he surveyed the Isthmus of Suez and made plans for the Suez Canal. French Saint-Simonianists showed an interest in the canal and in 1833, Barthélemy Prosper Enfantin tried to draw Muhammad Ali's attention to the canal but was unsuccessful. Alois Negrelli, the Italian-Austrian railroad pioneer, became interested in the idea in 1836.

In 1846, Prosper Enfantin's Société d'Études du Canal de Suez invited a number of experts, among them Robert Stephenson, Negrelli and Paul-Adrien Bourdaloue to study the feasibility of the Suez Canal (with the assistance of Linant de Bellefonds). Bourdaloue's survey of the isthmus was the first generally accepted evidence that there was no practical difference in elevation between the two seas. Britain, however, feared that a canal open to everyone might interfere with its India trade and therefore preferred a connection by train from Alexandria via Cairo to Suez, which Stephenson eventually built.

Construction by the Suez Canal Company

Suez Canal Preparations (1854–1858)

In 1854 and 1856, Ferdinand de Lesseps obtained a concession from Sa'id Pasha, the Khedive of Egypt and Sudan, to create a company to construct a canal open to ships of all nations. The company was to operate the canal for 99 years from its opening. De Lesseps had used his friendly relationship with Sa'id, which he had developed while he was a French diplomat in the 1830s. As stipulated in the concessions, de Lesseps convened the International Commission for the piercing of the isthmus of Suez (Commission Internationale pour le percement de l'isthme de Suez) consisting of 13 experts from seven countries, among them John Robinson McClean, later President of the Institution of Civil Engineers in London, and again Negrelli, to examine the plans developed by Linant de Bellefonds, and to advise on the feasibility of and the best route for the canal. After surveys and analyses in Egypt and discussions in Paris on various aspects of the canal, where many of Negrelli's ideas prevailed, the commission produced a unanimous report in December 1856 containing a detailed description of the canal complete with plans and profiles. The Suez Canal Company (Compagnie universelle du canal maritime de Suez) came into being on 15 December 1858.

The British government had opposed the project from the outset to its completion. The British, who controlled both the Cape route and the Overland route to India and the Far East, favored the status quo, given that a canal might disrupt their commercial and maritime supremacy. Lord Palmerston, the project's most unwavering foe, confessed in the mid-1850s the real motive behind his opposition: that Britain's commercial and maritime relations would be overthrown by the opening of a new route, open to all nations, and thus deprive his country of its present exclusive advantages. As one of the diplomatic moves against the project when it nevertheless went ahead, it disapproved of the use of "forced labour" for construction of the canal. Involuntary labour on the project ceased, and the viceroy condemned the corvée, halting the project.

International opinion was initially skeptical, and shares of the Suez Canal Company did not sell well overseas. Britain, Austria, and Russia did not buy a significant number of shares. With assistance from the Cattaui banking family, and their relationship with James de Rothschild of the French House of Rothschild bonds and shares were successfully promoted in France and other parts of Europe. All French shares were quickly sold in France. A contemporary British skeptic claimed "One thing is sure... our local merchant community doesn't pay practical attention at all to this grand work, and it is legitimate to doubt that the canal's receipts... could ever be sufficient to recover its maintenance fee. It will never become a large ship's accessible way in any case."

Suez Canal Construction (1859–1869)

Work started on the shore of the future Port Said on 25 April 1859.

The excavation took some 10 years, with forced labour (corvée) being employed until 1864 to dig out the canal. Some sources estimate that over 30,000 people were working on the canal at any given period, that more than 1.5 million people from various countries were employed, and that tens of thousands of labourers died, many of them from cholera and similar epidemics.

Estimates of the number of deaths vary widely with Gamal Abdel Nasser citing 120,000 deaths upon nationalisation of the canal in a 26 July 1956 speech and the company's chief medical officer reporting no higher than 2.49 deaths per thousand in 1866. Doubling these estimates with a generous assumption of 50,000 working staff per year over 11 years would put a conservative estimate at fewer than 3,000 deaths. More closely relying on the limited reported data of the time, the number would be fewer than 1,000.

Suez Canal Company Towns

From its inauguration, till 1925, the Suez Canal Company built a series of company towns along the canal to serve its operation. They included ports and their facilities as well as housing for employees segregated by race or nationality. These were Port Said (1869) and Port Fuad (1925) at the canal's northern entrance by the Mediterranenan, Ismailia (1862) near the middle and north of Lake Timsah, and Port Twefik (1867) at the canal's southern entrance on the Red Sea.

Suez Canal Inauguration (17 November 1869)

The canal opened under French control in November 1869. The opening ceremonies began at Port Said on the evening of 15 November, with illuminations, fireworks, and a banquet on the yacht of the Khedive Isma'il Pasha of Egypt and Sudan. The royal guests arrived the following morning: the Emperor Franz Joseph I, the French Empress Eugenie in the Imperial yacht L'Aigle, the Crown Prince of Prussia, and Prince Louis of Hesse. Other international guests included the American natural historian H. W. Harkness. In the afternoon there were blessings of the canal with both Muslim and Christian ceremonies, a temporary mosque and church having been built side by side on the beach. In the evening there were more illuminations and fireworks.

On the morning of 17 November, a procession of ships entered the canal, headed by the L'Aigle. Among the ships following was HMS Newport, captained by George Nares, which surveyed the canal on behalf of the Admiralty a few months later. The Newport was involved in an incident that demonstrated some of the problems with the canal. There were suggestions that the depth of parts of the canal at the time of the inauguration were not as great as promised, and that the deepest part of the channel was not always clear, leading to a risk of grounding. The first day of the passage ended at Lake Timsah, 76 kilometres (41 nmi) south of Port Said. The French ship Péluse anchored close to the entrance, then swung around and grounded, the ship and its hawser blocking the way into the lake. The following ships had to anchor in the canal itself until the Péluse was hauled clear the next morning, making it difficult for them to join that night's celebration in Ismailia. Except for the Newport: Nares sent out a boat to carry out soundings, and was able to manoeuver around the Péluse to enter the lake and anchor there for the night.

Ismailia was the scene of more celebrations the following day, including a military "march past", illuminations and fireworks, and a ball at the Governor's Palace. The convoy set off again on the morning of 19 November, for the remainder of the trip to Suez. After Suez, many of the participants headed for Cairo, and then to the Pyramids, where a new road had been built for the occasion.
  • An Anchor Line ship, the S.S. Dido, became the first to pass through the Canal from South to North.
Suez Canal Initial Difficulties (1869–1871)

Although numerous technical, political, and financial problems had been overcome, the final cost was more than double the original estimate.

The Khedive, in particular, was able to overcome initial reservations held by both British and French creditors by enlisting the help of the Sursock family, whose deep connections proved invaluable in securing much international support for the project.

After the opening, the Suez Canal Company was in financial difficulties. The remaining works were completed only in 1871, and traffic was below expectations in the first two years. De Lesseps therefore tried to increase revenues by interpreting the kind of net ton referred to in the second concession (tonneau de capacité) as meaning a ship's cargo capacity and not only the theoretical net tonnage of the "Moorsom System" introduced in Britain by the Merchant Shipping Act in 1854. The ensuing commercial and diplomatic activities resulted in the International Commission of Constantinople establishing a specific kind of net tonnage and settling the question of tariffs in its protocol of 18 December 1873. This was the origin of the Suez Canal Net Tonnage and the Suez Canal Special Tonnage Certificate, both of which are still in use today.

Suez Canal Overview

Suez Canal Coordinates: 30°42′18″N 32°20′39″E

Suez Canal Length: 193.3 km (120.1 miles)
Suez Canal Maximum Boat Beam: 77.5 m (254 ft 3 in)
Suez Canal Maximum Boat Draft: 20.1 m (66 ft)
Suez Canal Locks: None
Suez Canal Navigation Authority: Suez Canal Authority
Suez Canal Construction Began: 25 April 1859
Suez Canal Date Completed: 17 November 1869
Suez Canal Start Point: Port Said
Suez Canal End Point: Suez Port

Suez Canal Route Map

km       W E

           Mediterranean Sea
           Approaches (Southward convoy waiting area)
0.0     Port Said

           Martyr Mujand Abanoub Girgis Bridge
           Al Salam Bridge
51.5   Eastern lane: New Suez Canal (2015)

           El Ferdan Railway Bridge (under construction)
76.5   Ismaïlia, SCA headquarters

           Tunnel Ismailia
           New Ismala
           Lake Timsah

           Maadia Al Qantarah Street
95.0   Deversoir

           Great Bitter Lake
           Small Bitter Lake

           Ahmed Hamdi Northern Tunnel
           Ahmed Hamdi Tunnel
           Martyr Ahmed El-Mansy Pontoon Bridge
           Overhead powerline

162    Suez, Suez Port
           Gulf of Suez (Northward convoy waiting area)
           Red Sea



 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: