Ring Rail Line (Kehärata)

Ring Rail Line (Kehärata)

The Ring Rail Line or in Finnish: Kehärata, in Swedish: Ringbanan, formerly Marjarata is a railway route in the area of the city of Vantaa, in the Greater Helsinki Metropolitan area of Finland. It connects Helsinki-Vantaa Airport and the adjacent Aviapolis business and retail district to the Helsinki commuter rail network. The line fills the gap between Vantaankoski and Tikkurila railway stations, travelling in tunnel underneath the airport.
  • The line started operating on 1 July 2015.
Ring Rail Line (Kehärata) History

The founding stone of the line was laid on 3 March 2009, and construction was started on 13 May 2009 with the excavation of service tunnels. The excavation of a 300 m long tunnel station under the airport was completed in March 2010, as the construction was proceeding on schedule.

In February 2011, a video on the project's official website stated that the project would be open by June 2014. It announced various new details, including that the station at Tikkurila would be entirely rebuilt as an integrated travel centre, as well as details on the trains that would serve the airport. In September 2012, the opening date was pushed back to July 2015, due to the unexpected need to re-design and reinforce the airport station tunnel to withstand the acidic products of propylene glycol decay by bacteria within the ground. Propylene glycol is used as a de-icing agent for the planes.

The Ring Rail Line started operating on 1 July 2015. The station at the Helsinki Airport opened later, with the Tietotie entrance opening on 10 July and the direct connection to the terminal opening in December 2015.

Ring Rail Line (Kehärata) Route

The new line creates a connection from the airport to Helsinki central railway station, as well as the suburban areas on the route. The new railway leaves the mainline going north from Helsinki after Tikkurila station in the east, travel via the airport and into Vantaankoski station to the west, joining the existing the branch line for western Vantaa which was previously served by the "M" train. Five new stations were built, with space reserved for three more in the future.

The line is served by the "P" and "I" trains which travel the ring clockwise and anticlockwise respectively. The journey time from the airport to Helsinki central railway station is 27 minutes ("P" train) or 32 minutes ("I" train), whilst the time to Tikkurila, to connect with long-distance trains going north or east, is 8 minutes. Both trains operate every 10 minutes in the daytime.

Ring Rail Line (Kehärata) Stations

In the first phase, five new stations were built at Vehkala, Kivistö, Aviapolis, Helsinki-Vantaa Airport and Leinelä. Out of these, the Aviapolis and Airport stations are located in a tunnel. Reservations have been made for three additional stations: Petas (surface), Viinikkala (tunnel) and Ruskeasanta (tunnel).

Ring Rail Line (Kehärata) Cost

The projected cost of the construction is €655 million as of September 2012, up from €605 million in March 2010. The estimated cost of the project in December 2014 was €738.5 million. The current estimated cost of the project is €773.8 million

Ring Rail Line(Kehärata) Future Development

Separate proposals exist to extend the Helsinki Metro to the airport, and to move long-distance services from the current main North-South corridor to a new railway between Pasila and Kerava, passing through the airport. This new route, known as Lentorata, would travel in a long tunnel under the airport and allow direct access from long-distance trains, as well as free the rail capacity taken up by long-distance traffic in the current main corridor for the increasing local commuter traffic.

Ring Rail Line (Kehärata) Overview

Ring Rail Line Locale: Vantaa, Southern Finland
Ring Rail Line Termini:
Vantaankoski
Merges with Main line (local tracks)
between Hiekkaharju and Koivukylä stations
Ring Rail Line Stations: 5 (+ 3)
Ring Rail Line Opened: 1 July 2015
Ring Rail Line Length: 18 km (11 mi)
Ring Rail Line Number of Tracks: Double track
Ring Rail Line Track Gauge: 1,524 mm (5 ft)
Ring Rail Line Electrification: 25 kV @ 50 Hz
Ring Rail Line Operating Speed: 120 km/h (75 mph)

 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: