Fugleflugtslinjen (Vogelfluglinie) (Ferry-Rail)Fugleflugtslinjen (Vogelfluglinie)The Vogelfluglinie in German or Fugleflugtslinjen in Danish is a transport corridor between Copenhagen, Denmark, and Hamburg, Germany. As the Danish and German names both literally translate as: bird flight line. They imply, the corridor is also an important bird migration route between arctic Scandinavia and Central Europe. Fugleflugtslinjen History Proposals for a more direct "bird flight line" date back from the 1920s. Construction was started on the Danish side in 1941 after the Nazi occupation force pushed the matter, but work was halted again in 1946. After World War II, Warnemünde (near Rostock) was included in the territory of East Germany. Political divisions made traffic between Denmark and West Germany via Warnemünde inconvenient. From 1951 to 1963 a ferry line from Gedser to Großenbrode operated as a temporary solution. In addition, traffic between Copenhagen and Hamburg would either be directed over the Great Belt ferry, Funen and Jutland or the Gedser-Warnemünde ferry. Construction of the "bird flight line" was restarted in 1949 and completed in 1963. On 14 December 2019 at 20:02 the last train from DSB and Deutsche Bahn arrived in Rødbyhavn. Trains between Hamburg and Copenhagen will run via Funen and Jutland until the Fehmarnbelt connection is completed. The rail ferry was discontinued because service would have been degraded massively while works on Sydbanen are ongoing. Fugleflugtslinjen Ferry Link The core of the connection is the 19-kilometre (12 mi) ferry link between Rødby (Denmark) and Puttgarden (Germany). The line is operated by Scandlines. Ferries take 45 minutes and operate twice an hour, 24 hours a day. The projected Fehmarn Belt Fixed Link, an undersea tunnel, will replace the ferries. Danish-German negotiations on 29 June 2007 culminated in an agreement to complete the link by 2028, essentially on the basis of Danish funding. Fugleflugtslinjen Landside Connections Fugleflugtslinjen Roadway The road connection consists of:
The Fugleflugtslinjen rail connection consists of:
These current bridges and tunnels are part of the connection:
The 'Railway axis Fehmarn Belt' is the Priority Project 20 of the Trans-European Transport Network (TEN-T) that seeks to establish a high-speed rail line Copenhagen–Hamburg, and which central section is the Fehmarn Belt tunnel's railway. In the north, it connects to the Øresund Bridge/Drogden Tunnel (Priority Project 11) and the Nordic Triangle railway/road axis (Priority Project 12), and in the south to Bremen and Hanover. The full line currently under construction consists of several new railways to be built and old railways to be upgraded, to achieve at least a maximum speed of 200 km/h on all sections:
Fugleflugtslinjen Coordinates: 54°34′N 11°17′E | |||||
|