Arlanda Express (Stockholm Arlanda Airport Express)

Arlanda Express (Stockholm Arlanda Airport Express)

Arlanda Express is an airport rail link connecting Stockholm Central Station with the Stockholm Arlanda Airport outside Stockholm, Sweden. Operated by A-Train AB, the trip takes 18 minutes and runs three to six times per hour using seven X3 electric multiple units. The services operate over the East Coast and Arlanda Lines calling at Stockholm Central, Arlanda North and Arlanda South stations. The service was used by 2.7 million passengers in 2007 and by 3.3 million passengers in 2012.

Planning of the airport link started in the 1980s. In 1993 the Government of Sweden issued a tender for a public–private partnership (PPP) to build the Arlanda Line. The construction of the line was subsidized with a combination of some state grants and large state loans. The successful tenderer would receive a monopoly on traffic between the airport and Stockholm until 2040. The line and the services were inaugurated on 25 November 1999. The PPP contract has since been criticized for being unclear, uneconomical for the state and leading to a low utilization of the service as ticket prices are very expensive at 300 SEK (around 30 EUR) for an adult single ticket on the very short journey. The railroad is owned by two Australian pension funds and partly (37.5%) by the Gingko Tree Investment Ltd, a subsidiary of Chinese State Administration of Foreign Exchange.

Arlanda Express Service

The Arlanda Express connects the city center of Stockholm, at Stockholm Central, to Stockholm Arlanda Airport. At the airport, the train serves two stations: Arlanda South, which serves terminals 2, 3 and 4, and Arlanda North, which serves terminal 5. From Stockholm to Rosersberg, the train follows the East Coast Line, and from there to the airport, the Arlanda Line.

The train operates from three times an hour to six times per hour during rush hour. As of 2024, the standard price for a one-way ticket is SEK 320, although discounts are offered for children, students, seniors, on special travel days and for return trips under certain conditions. The Arlanda Express is operated by A-Train, which also built the Arlanda Line as part of a public–private partnership. The company holds an exclusive concession to operate any train service between Stockholm and the airport. In addition, the company is free to charge other train operators that use the Arlanda Line and stop at Arlanda Central Station.

Arlanda Express Rolling Stock

The Arlanda Express is operated by seven four-car X3 electric multiple units. The units were built by Alstom's Washwood Heath plant in 1998 and 1999. The train consists of two powered end units and two non-powered center cars. The trains have a maximum speed of 200 km/h (125 mph) and a maximum power output of 2,240 kilowatts (3,000 hp). They are 93 metres (305 ft) long and weigh 187 tonnes (184 long tons - 206 short tons). Each car has two doors on each side, and the train has seating for 190 passengers. There is a baggage area beside each door, seating for people with a disability and a toilet in the middle of the train. The Arlanda Express' three stations have a special platform height that allows level access to the trains from the platforms. In 2006, the trains were renovated and received new interiors in three different color schemes, green, orange and blue, designed by the former Swedish tennis player Björn Borg's eponymous fashion label.

Arlanda Express History

Plans for an airport rail link from the central business district of Stockholm and the airport was launched in the early 1980s. The goal was to reduce road congestion and emissions while allowing Arlanda to keep increasing passenger numbers. The Swedish Rail Administration made a specific plan in the late 1980s which involved the construction of a branch from the existing East Coast Line. This resulted in a project plan which was launched in 1990, which specifically suggested Rosersberg and Odensala as the intersections with the existing line. The political decision to build the line was taken in 1993. Estimates at the time gave a ridership of 5.1 million passengers per year in 2005.

The Swedish Rail Administration had proposed that the line was to be built with the government agency as owner and with either SJ or private railway companies as train operators. However, the Cabinet of Carl Bildt wanted private sector involvement in the construction and operation of the line. In 1993, the Government put in place a public tender to build and operate the line. In 1994, Arlanda Link Consortium was chosen, consisting of the Nordic Construction Company, SIAB, Vattenfall, GEC-Alsthom and Mowlem. A-Banan Projekt AB was established as a limited company in 1994 to oversee the project. The consortium established A-Train AB to be the project developer and then operate the Arlanda Express until 2040. The legal responsibility for the project was transferred from the consortium to A-Train in 1995. As part of the agreement, A-Train received from the Swedish Government 850 million Swedish krona (SEK) in a grant and SEK 1 billion in a loan to help finance the project. The company was also allowed to operate a shuttle service from Stockholm C to Arlanda and charge a non-discriminating fee for all other trains using the line.

Total investment costs for the project were SEK 6 billion, of which SEK 2 billion was financed through state grants to the Swedish Rail Administration who built the quadruple track along the East Coast Line. The public–private partnership part of the project involved two new tracks at Stockholm C and the Arlanda Line, costing SEK 4.1 billion. Of this, SEK 2.4 billion was financed by the state. In addition, the state held a financial guarantee to Nordea for the X3 trains, should A-Train fail to meets its financial obligations to the bank. A-Train was also granted an interest-free deferral on the payment of the fees at Stockholm C and Arlanda, costing the state SEK 90 million. Of A-Train's capital loan for SEK 2.2 billion, SEK 1.8 billion was borrowed from three state-owned financial institutions: the Swedish National Debt Office, the Swedish Export Credit Corporation and the Nordic Investment Bank. In addition, 20% of the share capital was secured through Vattenfall's equity in the company.

The Arlanda Line and the Arlanda Express started operations on 25 November 1999. After the construction was completed, the ownership of the infrastructure was transferred to A-Banan Projekt. However, A-Train is responsible for paying for all maintenance and operating costs of the line. In 2004, A-Train was bought by Macquarie Group, who paid SEK 70 million for the company, in addition to taking over debt worth SEK 330 million.

In 2004, the Swedish National Audit Office criticized the process of building and financing the Arlanda Line, and stated that the State had taken more financial risk than the Riksdag had been informed about. It also criticized the Government for giving additional financial support to A-Train in the form of guarantees without informing the Riksdag, and having an unclear management strategy. It also commented that the traffic forecasts during planning were incorrect. The original plans showed an economic benefit of SEK 4 billion. However, because A-Train is free to set its ticket prices as it wishes, the high prices resulted in too few passengers taking the Arlanda Line for it to be of economic benefit to the Swedish community, and the line failed to maximise its economic impact through reduced road congestion and emissions.

In a motion passed by the Riksdag on the 7 October 2008, the Arlanda Line Agreement was unanimously criticized and characterized as the "worst possible agreement Arlanda could have". A-Train is free to set whatever fees its sees fit on the line, both regarding their own ticket prices on the Arlanda Express and what fees it charges other train operators. This framework had resulted in a significant rise in ticket prices and results in a low levels of public transport use for ground transportation to the airport.

The Swedish State holds an option to purchase the traffic rights from A-Train in 2010, which would eliminate the fees and allow other operators to run directly from the airport to the city center. As of 2008, the train had a 9% market share for employees and a 25% market share for passengers traveling to the airport. Commentators and politicians have stated that the business model results in a low utilization of the line because of the high ticket prices, which has caused the airport to not reach its targeted emission goals.

The CEO of A-Train, Per Thorstensson, stated that it would be a waste of tax payers' money to purchase the line in 2010, as the state would receive the line free of charge in 2040. Originally A-Train was required to accumulate capital of SEK 600 million before it could pay dividends, but this was changed to SEK 150 million in 2008, after an agreement was made with Arlandabanan Infrastructure.

In 2014, Macquarie sold A-Train to STC Pooled Fund, Sunsuper, and the State Administration of Foreign Exchange.

Arlanda Express Accidents and Incidents

At 4:40am on May 27, 2023, a northbound Arlanda Express service from Stockholm to Arlanda derailed on the Arlanda Line east of Märsta. Of 70 people on board, two were injured and required hospitalization. The train derailed while travelling at approximately 150km/h and around 1km of the track was damaged. Following the accident all rail services to Arlanda were suspended until repairs could be carried out.

Arlanda Express Overview

Arlanda Express Termini:
Stockholm Central
Arlanda South
Arlanda Express Stations: 3
Arlanda Express Service Type: Airport rail link
Arlanda Express Operator(s): A-Train AB
Arlanda Express Rolling Stock: X3
Arlanda Express Opened: 25 November 1999
Arlanda Express Line Length: 39 kilometres (24 mi)
Arlanda Express Track Gauge: 1,435 mm (4 ft 8+1⁄2 in)

Arlanda Express Route Map

km
39.0    Arlanda North Stockholm Arlanda Airport Terminal 5
38.5    Arlanda South Stockholm Arlanda Airport Terminals 2 3 4

0.0      Stockholm Central

 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: