East Link Sweden (Ostlänken)

East Link (Ostlänken)

The East Link or in Swedish: Ostlänken is a planned high-speed railway in Sweden, intended to run from Södertälje (just south of Stockholm) to Linköping.

East Link (Ostlänken) Background

The time plan was originally to start building by 2017, with the goal of trains becoming operational in 2033-2035. The construction cost for the new 160-kilometre railway was calculated to be 30 billion SEK in 2012. A detailed plan from the Swedish rail administration was published in December 2008, the Swedish government gave the go ahead in August 2012. In 2019, Swedish infrastructure manager Trafikverket commissioned Ramboll and Atkins to research and design the railway.

East Link (Ostlänken) Train Speeds

The railway will be built to allow train speeds of 250 km/h (155 mph). It was originally planned for speeds up to 320 km/h (200 mph). In 2018, the Swedish Transport Administration decided that the line instead would be designed for speeds up to 250 km/h, citing reduced costs (by 11 billion SEK, from 65 billion to 54 billion). However, this requires 1–2 years of adjusting the original plans.

East Link (Ostlänken) Route

Long-distance trains would call at Stockholm Central Station and Södertälje Syd before joining the new line, on which there would be an intermediate stop at Norrköping, and reach Linköping about 40 minutes faster than by the existing line. Between Södertälje and Norrköping, regional trains would make additional stops at Vagnhärad and Skavsta Airport, and make a brief detour onto the existing line to Nyköping.

East Link (Ostlänken) Future Expansion

In a little more distant future, a new railway connecting Linköping-Göteborg via Jönköping is planned, called Götalandsbanan. Together, the Ostlänken and Götalandsbanan railways would allow trains to travel between Stockholm-Göteborg in under two hours.

East Link (Ostlänken) Sweden Overview

East Link (Ostlänken) Native Name: Ostlänken
East Link (Ostlänken) Status: Planned
East Link (Ostlänken) Owner: Swedish Transport Administration
Termini:
Järna
Linköping
East Link (Ostlänken) Service Type: high-speed rail
East Link (Ostlänken) Planned Opening: 2033–2035
East Link (Ostlänken) Line Length: 160 km (100 mi)
East Link (Ostlänken) Number of Tracks: 2
East Link (Ostlänken) Track Gauge: 1,435 mm (4 ft 8+1⁄2 in) standard gauge
East Link (Ostlänken) Operating Speed: 250 km/h (155 mph)
East Link (Ostlänken) Signalling: ERTMS

 
Rail Holidays
Rail Vacations
Luxury Trains
Luxury Tours
International Trains
International Tours
www.Rail-Pass.com
                             
home www.Rail-Pass.com Rail-Pass & Train Tickets & International Rail Holidays Hotel Booking & Hotel Reservations & Hotel Accomodation B&B Booking & B&B Reservations & B&B Accommodation Hostel Booking & Youth Hostel Reservations & Hostel Accommodation Chalet Rental & Holiday Homes & Vacation Homes Ski Pass Booking & Ski Pass Reservations & Ski Lift Pass Flight Tickets & Airline Reservations & Flight Booking Ferry Tickets & Ferry Booking & Ferry Reservations Car Rental Booking & Car Hire Reservations Excursions & Days Out & Day Trips & Theme Parks Rail Pass Booking & Rail Pass Reservations & Eurail & Interrail Rail Tickets & Rail Reservations & International Train Tickets Weekend Trips & Weekend Breaks & Weekend Away  Travel Insurance & Business Travel Insurance Eurotunnel Tickets & Eurotunnel Le Shuttle Reservations
Search: